300 KW – Alameda County, California

 

 
On average, this project generates

which is enough electricity to power

% Breakdown of Total System Cost

*Balance of System includes all project costs not directly relate to the system’s panels.

This project is California’s first tracking carport.

 

Stephen Smith managed the engineering, installation and startup of a tracking carport project in Fremont, CA for a former employer.

 

As project manager for this project, Stephen provided the following services:

  • Conducted the site audit including grid connection and soil/ground conditions
  • Managed internal and external design and engineering resources
  • Interacted with the client to revise and complete a permit ready system design
  • Achieved the project’s building permit
  • Conducted an EPC RFQ process
  • Assembled a team of subcontractors
  • Managed the schedule and budget for the construction process
  • Managed onsite construction
  • Energized the system upon construction completion
Project Details 
ModulePolycrystalline
Size300KW
StructureSingle Axis Tracking
LocationAlameda County, CA
Site TypeCounty Building Parking Lot
ClientMunicipal Government
StatusOperational since 2005

 