200 KW – Puertollano, Spain


 

On average, this project generates

which is enough electricity to power

% Breakdown of Total System Cost

*Balance of System includes all project costs not directly relate to the system’s panels.

During the course of this project Stephen Smith:

  • Conducted the site audit
  • Managed internal and external design and engineering resources
  • Developed the project’s full design package
  • Conducted an engineering RFQ process
  • Assembled a team of subcontractors
Project Details 
ModuleHCPV Module
Size200KW
StructureDual Axis Tracking
LocationPuertollano, Spain
Site TypeResearch Facility
ClientNon-profit R&D Company
StatusOperational

 