On average, this project generates

which is enough electricity to power

% Breakdown of Total System Cost

*Balance of System includes all project costs not directly relate to the system’s panels.
Stephen Smith managed the engineering, installation, and startup of a 690W rooftop system in Union City, CA for a former employer.
As project manager, Stephen provided the following services:
- Conducted the site audit including grid connection and rooftop structural conditions
- Managed internal and external design and engineering resources
- Interacted with the client to revise and complete a permit ready system design
- Achieved the project’s building permit
- Conducted an EPC RFQ process
- Assembled a team of subcontractors
- Managed the schedule and budget for the construction process
- Managed onsite construction
- Energized the system upon construction completion